Type values into the sheet, or leave it empty to print a blank format. Batch corrections (from water absorption and moisture content), compressive strength (load on a 150 mm cube) and the average of each set of 3 cubes are worked out as you type. Typed values are saved for this project.
| Trial Mix of Concrete | Lab Job No.: |
|||||||
Page No.: | ||||||||
Sampled by: | ||||||||
Tested by: | ||||||||
Laboratory No.: |
Date of Sampling: |
|||||||
Grade of Concrete: |
Date of Testing: |
|||||||
Location: |
Plant: |
|||||||
Structure to be used for: |
Slump Requirement: |
|||||||
TMS: |
Time: |
|||||||
| Remarks : | ||||||||
|
Name:
Date:
Contractor's Representative
|
Name:
Date:
Concessionaire's/PMC Representative
|
Name:
Date:
IE's Representative
|