Fill in the pipe details and the observed readings, or leave the sheet empty to print a blank format. Where the specified limit is blank on the format you can type one in. Typed values are saved for this project.
| SUMMARY OF TEST RESULTS FOR RCC HUME PIPES [As per IS:458 - 2003 & IS:3597 - 1998] | ||||
| Concrete Pipes Class | ||||
| Source/Location | ||||
| Dia of Pipes | ||||
| No of Pipes | ||||
| Lot No | ||||
Date of Testing : | ||||
| Sl.No | Description of Test | Specified limits as per IS: 458-1988 | Observed Readings | Remarks |
| 1 | Overall length | ± 1% of Standard length | ||
| 2 | Internal diameter | |||
| 3 | Wall thickness | |||
| 4 | Deviation from straight | < 3mm/m | ||
| 5 | Three Edge Bearing Test | |||
| 6 | Hydrostatic Test | 0.07 N/mm2 | ||
| 7 | Permeability Test | |||
| a) Initial absorption | < 2 Cm3 & Diff in any two readings | |||
| b) Final Permeability | 0.3 Cm3 | |||
| Remarks : | ||||
|
Name:
Date:
Contractor's Representative
|
Name:
Date:
Concessionaire's/PMC Representative
|
Name:
Date:
IE's Representative
|