Permeability Test (Hume Pipes)

Format · IS:3597-1998 · initial absorption and final permeability

Type the pipette readings at each time, or leave the sheet empty to print a blank format. "In cm³" is the change from the initial reading; initial absorption (at 2 hours) and final permeability (4th hour minus 3rd hour) are worked out and checked against IS 458 as you type. Typed values are saved for this project.

PERMEABILITY TEST
[As per IS:3597 -1998]
Concrete Pipes Class:
Source/Location:
Dia of Pipes:
No of pipes:
Lot No:
Date :
Remarks :
Name:
Date:
Contractor's Representative
Name:
Date:
Concessionaire's/PMC Representative
Name:
Date:
IE's Representative