← Concrete formats

Grouting Record

Format · MoRTH Appendix 1800/IV

Type the grouting details and tick Yes or No for each check, or leave the sheet empty to print a blank record. Typed values and ticks are saved for this project.

GROUTING RECORD
[As per MoRT&H Appendix 1800/IV]
Location:
Span No.Cable Nos.
:
Date of Cable InstallationDate of Grouting
:
Type of CementW/C Ratio
:
Name and amount of admixture used, if any:
Temperature:Mixing waterGrout:
Time:StartFinish:
Equipment:Grout MixerGrout Pump:
Cable duct diameter:DiametersLength:
Volume of Grout in litres:Regrouting:
Grouting Pressure:
Cement consumption:
Theoretical:
Actual:
Pre-grouting checks:
Free of blockage In let Out let
Vents Cable duct
Leakage observed Sealed
Grouting observations:
Passage of grout through vents
Passage of grout through outlets
Any equipment failure
:
Post grouting checks
:
Probing by stiff wire
:
Remarks
:
Name:
Date:
Contractor's Representative
Name:
Date:
Concessionaire's/PMC Representative
Name:
Date:
IE's Representative