Type the chainage, side, distance R (m) and bump integrator reading E (cm) for each run, or leave the sheet empty to print a blank format. X = E × 10 × 1000 / R, Y = 1.153 X + 214.8 (mm/km) and the average of Y are worked out as you type. Typed values are saved for this project.
| Roughness Test By Bump Integrator [As Per IRC:SP:16 -2004 ] | |||||||||
| Chainage | Side | Distance in Mtr. (R) | Bump Integrator Reading in "CM" (E) | Observed Unevenness Index (UI) | Calibrated Unevenness In "mm/km" | Average (mm/km) | Condition of Road Surface | Remarks | |
| From | To | X = (E *10 *1000/R) | Y = (1.153 * X + 214.8) | ||||||
| Remarks : | |||||||||
|
Name:
Date:
Contractor's Representative
|
Name:
Date:
Concessionaire's/PMC Representative
|
Name:
Date:
IE's Representative
|