Type W1, W2 and W3 for each test, or leave the sheet empty to print a blank format. A.I.V = W2 / W1 × 100, the average and W4 = W1 − (W2 + W3) for the discard check are worked out as you type. Typed values are saved for this project.
| AGGREGATE IMPACT VALUE TEST [As per IS 2386, (Part - IV)] | |||
Laboratory No.: |
Date of Sampling: |
||
Type of Material: |
Sampled By: |
||
Source: |
Date of Testing: |
||
Location: |
Test Conducted By: |
||
Proposed Use: |
|||
| Description | Test 1 | Test 2 | Test 3 |
| Average Value of A.I.V in % | |||
| Note : if W4 > 1 gm, discard and retest | |||
| Specification Limit: | WMM/BM/Concrete - 30% maximum DBM - 27% maximum BC - 24% maximum |
||
| Remarks :- | |||
|
Name:
Date:
Contractor's Representative
|
Name:
Date:
Concessionaire's/PMC Representative
|
Name:
Date:
IE's Representative
|