← Formats

Aggregate Impact Value Test

Format · IS 2386 (Part 4) · AIV, 3 tests

Type W1, W2 and W3 for each test, or leave the sheet empty to print a blank format. A.I.V = W2 / W1 × 100, the average and W4 = W1 − (W2 + W3) for the discard check are worked out as you type. Typed values are saved for this project.

AGGREGATE IMPACT VALUE TEST
[As per IS 2386, (Part - IV)]
Laboratory No.:
Date of Sampling:
Type of Material:
Sampled By:
Source:
Date of Testing:
Location:
Test Conducted By:
Proposed Use:
DescriptionTest 1Test 2Test 3
Average Value of A.I.V in %
Note : if W4 > 1 gm, discard and retest
Specification Limit: WMM/BM/Concrete - 30% maximum
DBM - 27% maximum
BC - 24% maximum
Remarks :-
Name:
Date:
Contractor's Representative
Name:
Date:
Concessionaire's/PMC Representative
Name:
Date:
IE's Representative