Design details
Individual Gradation — Summary
Each fraction’s % passing, sample by sample, and the average — entered in the Individual Gradation — Calculator on the right (screen 2).
Blending
Proportion of each fraction (top row) × its average % passing (from the Individual Gradation calculator, right) = its share; the shares add up to the combined % passing. The limits can be edited.
MDD & OMC (IS 2720 Part 8)
Atterberg limits (IS 2720 Part 5)
Aggregate impact value (IS 2386 Part 4)
Combined flakiness & elongation index (IS 2386 Part 1)
Los Angeles abrasion value (IS 2386 Part 4)
Specific gravity & water absorption (IS 2386 Part 3)
Ten percent fines (BS 812 Part 111)
California Bearing Ratio (IS 2720 Part 16)
Requirements & summary
Report
This app saves everything (test data) for the active project in your browser, tied to this folder. Logos and project details are entered once on the main Projects page and shared by every module.
Individual Gradation — Calculator
Combined Gradation — All-in Aggregate
The mixed material, by weight retained (optional). % retained is rounded to 2 decimals and added up for the cumulative %, as on the lab sheet.
Reference
Click a heading to expand.
Table 400-1 : Grading for Granular Sub-base Materials
| IS Sieve | I | II | III | IV | V | VI |
|---|---|---|---|---|---|---|
| 75.0 mm | 100 | - | - | - | 100 | - |
| 53.0 mm | 80-100 | 100 | 100 | 100 | 80-100 | 100 |
| 26.5 mm | 55-90 | 70-100 | 55-75 | 50-80 | 55-90 | 75-100 |
| 9.50 mm | 35-65 | 50-80 | - | - | 35-65 | 55-75 |
| 4.75 mm | 25-55 | 40-65 | 10-30 | 15-35 | 25-50 | 30-55 |
| 2.36 mm | 20-40 | 30-50 | - | - | 10-20 | 10-25 |
| 0.85 mm | - | - | - | - | 2-10 | - |
| 0.425 mm | 10-15 | 10-15 | - | - | 0-5 | 0-8 |
| 0.075 mm | <5 | <5 | <5 | <5 | - | 0-3 |
Table 400-2 : Physical Requirements
| Aggregate Impact Value (AIV) | IS 2386 (Part 4) or IS 5640 | 40 maximum |
| Liquid Limit | IS 2720 (Part 5) | Maximum 25 |
| Plasticity Index | IS 2720 (Part 5) | Maximum 6 |
| CBR at 98% dry density (at IS 2720 Part 8) | IS 2720 (Part 16) | Minimum 30 unless otherwise specified in the Contract |
MoRTH Specifications for Road and Bridge Works — verify against the current edition for your project.