1. Sample details
2. Test parameters
GSE (effective specific gravity of aggregate) is used in the Gmm formula; GSB (bulk specific gravity) is used in the VMA formula — the standard Asphalt Institute MS-2 treatment. If GSE has not been separately determined, enter the same value as GSB.
3. Marshall test results
One row per specimen. Weights in grams. Load in kN is the value read off the proving-ring/machine calibration for the dial gauge reading.4. Additional requirements (single-point tests)
5. Summary & conformity (average of specimens)
Averages are taken across every specimen row with complete data, then checked against MoRTH Table 500-11 by binder type.
6. Report
This app saves everything (test data) for the active project in your browser, tied to this folder. Logos and project details are entered once on the main Projects page and shared by every module.
Reference — MoRTH Table 500-11 Marshall requirements
Applies to both BC and DBM per MoRTH Table 500-11, 5th Revision. Verify against the current edition for your project.